Skip to content

National mapping

An entire survey, classified to your specification

We fit a classifier to your programme specification and run the whole survey on it: your class catalog, your tile scheme, your delivery windows. Quality control can be taken over and managed by us.

Open water, a railway with its station and the gardens behind it, all separated inside one catalog
Water, a railway and the gardens behind it, one catalog over all of them

What we do to it

Your catalog, your specification, at programme scale

We have classified ALS for the companies that fly it for years, and that is where the decisions in a workflow come from. We work from a modular training base, trained on datasets from Europe and several other locations worldwide, so fitting a classifier to your class list is measured in hours.

On the Digital Twin Germany programme the line runs at over 5,000 km² in 24 hours, which on that data is up to six terabytes.

Adapt

Your catalog, your sensors, tuned on the existing base.

Run at scale

The platform starts more machines when jobs queue, so a large survey is a scheduling question.

Check

Quality control against your acceptance criteria, which can be taken over and managed by us.

Vectorize

Objects and key points where the programme needs geometry as well as classes.

On real data

Water, coast and everything on it

One catalog has to hold over open water, a railway, a village and the gardens behind it, and hold the same way two tiles later.

Open water, a railway with its station and the gardens behind it, all separated inside one catalog

Dense urban areas at full density

Buildings, vegetation, ground and vehicles separated across a housing estate. Dense urban areas across different cities, historic town centres and industrial areas are the real challenge for a classifier.

A housing estate classified at full density, buildings against vegetation and ground

Extraction of complex infrastructure assets

High voltage lines, wind turbines, photovoltaic systems, towers and pipelines. Each has to be separated cleanly, so the whole area can be inventoried and analysed rather than one tile at a time.

A photovoltaic field and a high voltage line, both classified

Deliverables

What the survey is for

Classification

Every point in the cloud carries a class. That is what the filtering and the cleaning run on, and what every product under it is built from.

Terrain and surface models

DTM, DSM and the normalised surface model as rasters on your tile scheme, adapted to your specification.

Canopy height model

Canopy height across the survey, out of the classified cloud, for the forestry and biomass parts of the programme.

Change between two epochs

Ground, buildings, infrastructure and vegetation compared class by class against the previous campaign. That comparison is where a reflight earns its cost.

What lands in your hands

The output

Data in
  • Airplane
  • Helicopter
  • Drone

airborne lidar, at programme scale

Out
  • LAS
  • LAZ
  • DXF
  • Shapefile
  • CSV
  • GeoJSON

classified cloud and objects

The class catalog

Detect various objects on airborne laser scans. The model was optimized for point clouds with intensity values and average densities of 10 to 50 ppm². If no CRS is specified, the point cloud unit must be meter.

ClassifierALS

10 classes

Density10 to 50 pts/m²

recommended

Channels
  • Intensity

required in the file

IDs follow the ASPRS numbering in the LAS specification. Classes above 18 are ones we added for this catalog.

IDClass
2Ground
5Vegetation
6Building
12Power Pole
14Power Lines
15Transmission Tower
18Noise
19Street Furniture
20Vehicles
22Other

Where it runs

Pointly cloud

On Microsoft Azure inside the EU by default.

A region you name

A separate tenant in the Azure location your rules require.

Pointly Box

The whole stack on your own hardware, air gapped where that is the requirement.

Beyond the standard catalog

Custom model training and finetuning for your dataset

We train on your data and tune the model to the specification you work to. Classes get added, split or cut.

A project like yours

What the client said

“Together with BSF Swissphoto, Pointly worked in a focused manner toward the project goal of achieving a classification accuracy of over 95 %, and developed a tailored workflow that was precisely aligned with the project requirements and target structures.”
Jörg WertliCEO, BSF Swissphoto

Questions

Before you commit a survey

How much can you sustain in a day?

On the Digital Twin Germany programme the line runs at over 5,000 km² in 24 hours, on airborne data at roughly 40 points per m². That is up to six terabytes a day. A larger survey runs on more machines and finishes in the same window.

Can you work to our class catalog and our tile scheme?

Yes. We fit the classifier to your programme specification, your tile scheme and your delivery windows. We adapt the existing training base to a new catalog in hours.

Where does our data sit while it runs?

Your data sits on Microsoft Azure inside the EU by default, or in a separate tenant in the region your rules require. Where it has to stay on your own network, the same stack runs there as the Pointly Box.

See it on your own data

Send a sample and we will run the classifier on it, so you can judge the result rather than the description.